References

Industrial references with planning, selection, and operating context.

Each reference connects challenge, platform choice, execution logic and practical operating criteria so engineering and procurement teams can compare similar scenarios faster.

WHY REFERENCES MATTER

References reduce uncertainty before the commercial discussion gets deeper.

When a buyer sees a similar fuel route, industrial segment, or operating constraint already translated into a project path, the conversation moves faster from curiosity to technical engagement.

Challenge Results

Representative project snapshots for industrial steam applications.

Each reference highlights industrial sector, platform choice, fuel path, execution notes and operating context so engineering and procurement teams can review comparable scenarios.

  • Challenge: operational constraints by fuel, duty, emissions, and timeline
  • Solution: platform selection and key engineering measures
  • Results: capacity, operating conditions, and commissioning logic
6 t/h

Dairy processing | Brazil

Challenge: customer-specific standards and high chip moisture in a dairy application. Solution: VMU biomass boiler with pre-air heater and PLC plus supervisory controls. Result: reference package shaped for stable saturated steam generation.

6 t/h

Biomass steam export | Chile

Challenge: export a high-efficiency steam package with wet-chip firing and strict documentation requirements. Solution: VMIC-RG with high-chromium grate, factory interconnection and scope-specific documentation. Result: export-ready saturated-steam reference for Chile.

10 t/h

Petrochemicals | Colombia

Challenge: maintain steam continuity in petrochemical duty while meeting international requirements. Solution: FOUR boiler with economizer by-pass and combustion controls aligned to UL and CE criteria. Result: saturated-steam reference built for continuity and compliance.

Reference Filters

Industry Fuel Strategy Steam Capacity Country

Reference Project Visuals

Visual references organized by challenge, execution, commissioning and measurable outcomes.

Reference project visual - client challenge context
Client challenge context
Reference project visual - execution phase
Execution phase
Reference project visual - commissioning stage
Commissioning stage
Reference project visual - performance outcomes
Performance outcomes